Victron

Monitor your Victron system with Diagno

Connect a Victron site through VRM Portal and review available inverter, battery, solar-charger, meter and system measurements in Diagno alongside other supported sites.

What you can monitor

Inverter and solar charging

Where reported by supported devices, Diagno can display inverter generation, status and phase readings, plus selected solar-charger DC voltage, current and power values.

Battery readings

Review available battery state of charge and health, voltage, current, power, temperature and lifetime discharge energy.

Grid and site energy

For supported meter data, review grid import and export, frequency and whole-system consumption. Available channels vary with the VRM installation and connected equipment.

What to expect

Measurements depend on your system

Available measurements depend on your equipment and the data supplied through its monitoring portal.

How to connect

Create a VRM team for Diagno Energy, link the installations you want to share at User access level, and wait for Diagno to accept the invitation. Then enter each installation VRM Portal ID in Diagno.
Monitoring portalVictron VRM Portal
Site identificationVRM Portal ID, found in the installation Device list under Gateway details
Access routeCreate a VRM team invitation for Diagno Energy at connect@diagno.energy; link selected installations with User access

Connect through the VRM Portal

You need VRM access that lets you create a team and link installations. Diagno will confirm by email when the invitation has been accepted.

  1. Open VRM Teams

    Sign in to Victron Remote Management (VRM). In the sidebar, select Teams and Groups, then Teams.

  2. Create a Diagno team

    Select Create team. Choose any team name (the guide recommends Diagno Connection), enter Name: Diagno Energy and Email Address: connect@diagno.energy in Invitations, then create the team.

  3. Link the installations

    Select Link installations, choose the installations you want to share and set access level to User, then select Link installations.

  4. Wait for Diagno to accept

    Diagno will send you an email after accepting the invitation.

  5. Find the Site ID

    Open the installation in VRM, select Device list and expand Gateway details. The Site ID is the VRM Portal ID.

  6. Submit the Site ID in Diagno

    In Diagno, open Sites, select + Self-Onboard, choose Victron and enter the VRM Portal ID in the VRM Portal Identifier field. Continue through discovery and confirm the matching installation.

Useful questions

What identifier do I need?

Enter the VRM Portal ID. Open the installation in VRM, select Device list and expand Gateway details to find it.

Do I need to allow Diagno access first?

Yes. Create a VRM team invitation for Diagno Energy at connect@diagno.energy, link the installations to share and choose User access. Wait for Diagno's acceptance email before continuing.

What Victron equipment can Diagno monitor?

Diagno can display available readings for supported inverter, battery, meter, solar-charger and temperature-sensor device types. Exact signals depend on the devices and readings available for the installation.

Can I view a Victron installation with other brands?

Yes. A connected Victron site can be reviewed alongside other manufacturer systems supported by Diagno.

Get a clearer view of your system

Create your Diagno account to start connecting your system. If you need help with access or compatibility, talk to our team.